Products
Services
Careers
|
Suggest
The favorites are empty.
Menu
Products
 
Add to shopping list
k
KOSTAL
KOSTAL PIKO CI 100
Article No. 02-000975
5.682,00 € 
Save as new shopping list
Amount
EEEKOSTAL PIKO CI 100
Compare (0)
KOSTAL

KOSTAL PIKO CI 100

PIKO CI 100: performance, safety, flexibility

Product number:
02-000975
Manufacturer article number:
12182411
Availability:
Price per amount (net):

Product information

Specifications

SPEI Storage system: PV-Wechselrichter

NENN Nominal power: 100000 Watt

TOPO Topology: trafolos

MPPT Number of MPPT: 8 Stück

WUMI MPP voltage min: 540 Volt

WUMA MPP voltage max: 800 Volt

DCAN DC connection: H4

NETZ Network connection: 3-phasig

NETL Dimensions in mm: L: 936 mm B: 678 mm H: 365 mm

NETG Weight: 93 kg

Your Advantages

  • Arc detection with event notification

  • Rugged IP66 housing

  • Integrated type 2 ÜSS AC and DC side

  • High flexibility due to swarm connection
Documents for download
Data sheets (1)
Warranty terms (1)

Manufacturer Information

Over 100 years of eventful company history, countless technological innovations that share our lives today and quality made in Germany - KOSTAL is one of the major companies for innovation in the 20th and 21st centuries.

"Making complexity simple" - under this slogan KOSTAL developed the first dipped beam, the rain sensor, the first switch strip and driver assistance camera for the automotive industry. Now in its fourth generation as an owner-managed company, KOSTAL is now also one of the big players in the photovoltaic sector. The high-quality inverters and storage solutions support communication, they are powerful and ensure maximum yields.


KOSTAL

Product description

Product features

The three-phase 100 kW inverter from KOSTAL has 16 DC inputs and 8 MPP trackers and an input current of 20 A per MPPT. DC installation is simple, cost-effective and possible without string collection boxes.


The PIKO CI inverter offers optimal monitoring and service by monitoring the connected PV strings and is reliable in use due to its integrated and certified grid service functions.


We expect to receive the required certificates for connection to the medium-voltage grid in April 2024.

Delivery and shipping costs
k
Article comparison (0)
No articles have been selected for comparison yet
Close